Skip to content Sitemap

What’s Up At Waltham Landing? 8.15.2015

1) Mansard roof is shingled.

2) More plumbing, electrical and HVAC fixtures installed.

3) Insulation Drywall starts on the 2nd and 3rd floors.

 

 

 

Posted by: walthamlanding on August 15, 2015
Posted in: Uncategorized