Skip to content Sitemap

What’s Up at Waltham Landing? 7.15.2015

1) Installation of rough plumbing and electrical has began

2) Siding is installed

3) Utilities have been brought into the site

 

Posted by: walthamlanding on July 15, 2015
Posted in: Uncategorized